Electrical Engineering
Camp and borehole cabling
Earthing and lighting
Installation of generators
Design of a 236 man camp
Construction of all cable trays and laying of all cable
Supply of skilled labour to terminate, test and connect the 11KV cables
Fabrication of engine stands and lighting
LV and HV cabling
Lighting
Power installation
High & low voltage cabling
Installation of equipment ie bottle washers
Factory external lighting ( street lighting)
Installation of distribution boards
Installation of MV switches and ring and main units
Installation of MV transformers
Supply and installation of explosion street lighting
Electrical cabling
Earthing systems
Construction of all cable trays and laying of all cable
Supply of skilled labour to terminate, test and connect the 11KV cables
Replacement of wiring and control switch gear
Mechanical service of cranes
Testing of electromechanical parts such as the break solenoids, motors, drivers control switches, resistors and replacing damaged parts
Low voltage reticulation for power and lighting
Factory internal and external lighting
Lighting protection
Electrical Installations and cabling
Supply and installation of 63Amp distribution boards
Installation of security lights
Relocation of high mast lights at the support camps
Installation and connection of generators
LV cabling
Lighting
Power Installation
Installation of gas & flame
Detector system
Supply & installation of main switch board c/w gears
Supply and installation of 810KVA factory generator
Factory internal & external lighting on sodium lamps
Connection of power, data and earthing of weigh bridge
Supply and installation of fire alarm system
Supply & installation of ring main unit & its auto switch
Installation of emergency stop switches for
Compressors
Supply and installation of transformers
Connection of mobile factory weighing scales
Supply and installation of low voltage switch board
Ground earthing using exothermic welding material
Supply and installation of distribution boards & cabling
Supply & installation of power stabilisers & transformer
Supply and installation of auto fuel filtration system
Laying of welded wire mesh cable trays and cabling
Supply and installation of DBs and LV panel
Earthing and lightning protection
Supply and installation of main fire alarm system
Lighting
Plumbing and drainage
Air conditioning and ventilation
Supply of 5000l plastic water tank for
Water storage
Installation of main switch board
Earthing, earth leakage testing and wiring
Installation of new electrical panels and over head cable protection MCCBs
Supply and installation of new distribution board
Re-wiring of the green houses
Supply and installation of 1000A manual change over switch
Installation of GSM and BTS
Painting of towers
Installation of microwave dishes
Installation of antenna and feeder cables
Installation of radio station electrical systems such as masts, generators, panels, distribution boards and stabilisers
Electrical cabling
Installation of generators
Electrical cabling
Design and installation of low voltage cables, panels and generators
High voltage substation
External lighting
Conduits and power wiring only for fire detection
Conduits and power wiring for the security contractor
Low voltage cable reticulation for the raw power only
The design, supply and installation of one 4 leg 35 mtr telecommunication tower
The design fabrication and installation of one equipment shelter
The design, supply and installation of the grounding or earthing equipment
Supply and installation of sleeves or cable tray to shelter the antenna feeders
Installation of antenna cables
Fabrication of antenna mounting brackets
Removal and relocation and installation of 8 US government antennas
Supply and installation of lightning protection
Dismantling of existing radio towers
Installation of electrical lines on South and East walls
Site lighting
Full conduiting
Preparation of design and specs for switch board
Preparation of detailed shop drawings
Installation of generators
System testing and commissioning
LV and HV Cabling
Lighting
Power Installation
Keltron supplied and installed a number
of electrical equipment including;
Main switchboard
Sub-metering units
Distribution boards
Cable ladders.
LV and HV Underground Cabling of the
500KVA Transformer to the main meter.
Survey and design for new electrical distribution infrastructure to support the MRC laboratories
Design and project management, supervision and commissioning
Supply and installation of cable containment systems in the energy centre, new switch room, training building and laboratories
Installation of three generators, synchronizing panel and cabling installation
Design of duct banks and cable reticulation system
Supply, delivery and installation of electrical
equipment
Refurbishment of the 11kV sub-station, new
transformers and low voltage sub-distribution;
cabling to the suppliers motor control centres to
an international standard for a large South African
bottler – SABCO
11kV sub-station, new switchboards, small
power and lighting, lightning protection, earthing
and high bay lighting over the bottling lines
Test and full commissioning services
Sizing transformer, generator and
switch gear
Sizing of cables and installation
Provide As-Built drawings for M& E
services
Project Management and Supervision
Termination of by-pass switch and
synchronizing panel
Inspection and testing of the apartments