Electrical Engineering

Location:
Kampala and Moyo Respectively.
Project Date:
June 2011 to date
Project Value:
Location:
Buliisa Seismic Camp, Hoima
Project Date:
October - December 2010
Project Value:
USD $100,000

Camp and borehole cabling
Earthing and lighting
Installation of generators
Design of a 236 man camp

Location:
Jinja and Lugogo - Uganda Embakasi and Eldoret - Kenya
Project Date:
January 2005 – August 2007
Project Value:
US $626,000

Construction of all cable trays and laying of all cable
Supply of skilled labour to terminate, test and connect the 11KV cables
Fabrication of engine stands and lighting

Location:
Namanve, Kampala
Project Date:
Nov 2009 - Feb 2010
Project Value:
USD $586,000

LV and HV cabling
Lighting
Power installation

Location:
Namanve & Mbarara, Uganda
Project Date:
March 1998 – December 2000
Project Value:
US $1,200,000

High & low voltage cabling
Installation of equipment ie bottle washers
Factory external lighting ( street lighting)
Installation of distribution boards
Installation of MV switches and ring and main units
Installation of MV transformers

Location:
Kampala, Uganda
Project Date:
March – June 2009
Project Value:
US $30,000

Supply and installation of explosion street lighting
Electrical cabling
Earthing systems

Location:
Namanve, Kampala, Uganda
Project Date:
January – August 2008
Project Value:
US $770,000

Construction of all cable trays and laying of all cable
Supply of skilled labour to terminate, test and connect the 11KV cables

Location:
Kagera, Tanzania
Project Date:
July – September 2004
Project Value:
US $60,000

Replacement of wiring and control switch gear
Mechanical service of cranes
Testing of electromechanical parts such as the break solenoids, motors, drivers control switches, resistors and replacing damaged parts

Location:
Mubende, Uganda
Project Date:
July 2005 – March 2006
Project Value:
US $85,000

Low voltage reticulation for power and lighting
Factory internal and external lighting
Lighting protection

Location:
Hoima - Butiaba, Kyehoora, Karuka, Nziizi, Mputa and Buliisa
Project Date:
April 2006 - August 2007
Project Value:
US $140,000

Electrical Installations and cabling
Supply and installation of 63Amp distribution boards
Installation of security lights
Relocation of high mast lights at the support camps
Installation and connection of generators

Location:
Jinja, Uganda
Project Date:
January - November 2010
Project Value:
USD $279, 500

LV cabling
Lighting
Power Installation
Installation of gas & flame
Detector system

Location:
Namanve Industrial Park, Uganda
Project Date:
July 2013 to December 2014
Project Value:

Supply & installation of main switch board c/w gears
Supply and installation of 810KVA factory generator
Factory internal & external lighting on sodium lamps
Connection of power, data and earthing of weigh bridge
Supply and installation of fire alarm system
Supply & installation of ring main unit & its auto switch
Installation of emergency stop switches for
Compressors
Supply and installation of transformers
Connection of mobile factory weighing scales
Supply and installation of low voltage switch board
Ground earthing using exothermic welding material
Supply and installation of distribution boards & cabling
Supply & installation of power stabilisers & transformer
Supply and installation of auto fuel filtration system
Laying of welded wire mesh cable trays and cabling

Location:
Naggulu, Kampala, Uganda
Project Date:
June - December 2013
Project Value:

Supply and installation of DBs and LV panel
Earthing and lightning protection
Supply and installation of main fire alarm system
Lighting
Plumbing and drainage
Air conditioning and ventilation
Supply of 5000l plastic water tank for
Water storage

Location:
Nsimbe, Masaka Road, Uganda
Project Date:
November 2013-January 2014
Project Value:

Installation of main switch board
Earthing, earth leakage testing and wiring
Installation of new electrical panels and over head cable protection MCCBs
Supply and installation of new distribution board
Re-wiring of the green houses
Supply and installation of 1000A manual change over switch

Location:
Kampala, Uganda
Project Date:
March – August 2006
Project Value:
US $30,000

Installation of GSM and BTS
Painting of towers
Installation of microwave dishes
Installation of antenna and feeder cables

Location:
Gulu, Uganda
Project Date:
July – September 2005
Project Value:
US $99,000

Installation of radio station electrical systems such as masts, generators, panels, distribution boards and stabilisers

Location:
Bukoto, Kampala, Uganda
Project Date:
September 2003 - 2005
Project Value:

Electrical cabling
Installation of generators

Location:
Katwe, Kampala, Uganda
Project Date:
May 2003
Project Value:
US $100,000

Electrical cabling

Location:
Bugoto, Kampala, Uganda
Project Date:
August 2008 up to date
Project Value:
US $28,000

Design and installation of low voltage cables, panels and generators

Location:
Kampala, Uganda
Project Date:
January - Up to date
Project Value:
US $286,000

High voltage substation
External lighting
Conduits and power wiring only for fire detection
Conduits and power wiring for the security contractor
Low voltage cable reticulation for the raw power only

Location:
Kololo, Kampala, Uganda
Project Date:
November 2004 - January 2005
Project Value:
US $19,000

The design, supply and installation of one 4 leg 35 mtr telecommunication tower
The design fabrication and installation of one equipment shelter
The design, supply and installation of the grounding or earthing equipment
Supply and installation of sleeves or cable tray to shelter the antenna feeders
Installation of antenna cables
Fabrication of antenna mounting brackets
Removal and relocation and installation of 8 US government antennas
Supply and installation of lightning protection
Dismantling of existing radio towers

Location:
Kampala, Uganda
Project Date:
Sept 2006
Project Value:
US $261,000

Installation of electrical lines on South and East walls
Site lighting
Full conduiting
Preparation of design and specs for switch board
Preparation of detailed shop drawings
Installation of generators
System testing and commissioning

Location:
Namanve, Kampala
Project Date:
November 2009 - February 2010
Project Value:

LV and HV Cabling
Lighting
Power Installation